Tell us what needs concreting.
We will book a free measure, check the soil and the falls, classify the site, and send back a by-the-m² quote split into clear lines, so you can see exactly what you are paying for and compare it properly against anyone else. Want a number sooner? Send a photo of the old slab or the site and we will give you an indicative price first.
Fast and free
Send a few photos of the old slab or the site for an indicative price before we even visit, then a call or text back within one business day. Free and no obligation.
Itemised, not a round number
A by-the-m² quote that names the area and thickness, the site classification, the mesh and reo, the MPa, the base prep, the finish and control joints, with the AS 2870 paperwork where the slab is structural. No surprise figure at the end.
The crossover and permit conversation
If your job needs a crossover or a council permit, we tell you who pays for it and which approval it needs, and build it to the council and AS 2870 spec so it passes.
No surcharge nearby
Within 35km of Geelong there is no travel charge.
What an honest concrete quote itemises.
- 1 Square metres and thickness. The price broken down by the m² and the slab thickness, 100 mm for a standard driveway, stepped up for reactive soil or vehicles. Not one round number for "a slab".
- 2 The site classification (AS 2870). The site classification, Class A through E, that the slab and footings are designed to. This is the line a cheap quote skips, and it is what decides whether the slab cracks or holds.
- 3 The mesh and reo. The mesh and reo named and sized, SL72 or SL82 and any bars, set to the soil classification or the loads the slab carries, never a one-size slab over loose fill.
- 4 The MPa and slump (AS 3600 / AS 1379). The concrete strength in MPa and the slump, ordered to AS 1379 and placed to AS 3600. "Concrete" with no strength named is the warning sign, not the number.
- 5 Base prep and vapour barrier. The excavation, the compacted base, and the vapour barrier under a habitable slab, each itemised, never a pour straight onto loose fill that lets damp through later.
- 6 The finish and sealing. The finish named, broom, exposed aggregate, coloured or honed, and the sealing on a decorative slab, so you know exactly what surface you are getting and what it costs.
- 7 Control joints and the guarantee. The control joints cut at the right spacing so it cracks on the line, and the 10-year guarantee on the slab and footings in writing, with the AS 2870 paperwork where the slab is structural.
Slabline Concreting Co. is a composite reference site, so submitting this form does not send anything. On a live build the request lands with the concreter, who calls back within one business day to book the free measure.